| |
BGonline.org Forums
Preliminary rollout info
Posted By: Timothy Chow In Response To: Preliminary rollout info (Matt Cohn-Geier)
Date: Friday, 2 October 2009, at 3:16 a.m.
The modifications I tried were mostly variations in the positions of the two back checkers. I may have also tried moving the outfield blot.
The problem was that most things I tried produced a position where there was obviously a stronger play than any of the (analogues of the) plays being considered here.
| |
BGonline.org Forums is maintained by Stick with WebBBS 5.12.